Move from FRSB at 8.15am, WS and FZ and driver ENcik Zuhaimi.
9.40 tiba di tapak. Power tool is on the way. The process is recorded by fz in black notebook. 9.40 arrive on site. Wak n shaiful. Syafiq sampai kemudian 10.10 power tool sampai, tapi perlu dicaj. 10.19- bingkai 1 di letak atas tanah: T1 dan T2. Gelegar R1-RTP1-RTP2 dan alang A1-A2 di ikat. Selesai 10.30 Nota penuh ada dalam pdf yang di attach pada card ini
0 Comments
10.35 on site
Attendance: ws, fz sf &abir hadji. To dismantle the prototype. Brought with us safety helmets gloves ladder and hammers.
PIAS log entry 21st Feb 2024, Bukit Pelanduk,
WS,SF,FZ, Abir Hadji 10.15am
WS,FZ,SF
Pias log 1 feb 2024
Bengkel wak bukit pelanduk SF, WS, FZ, ABIR (PHD) En Ramli, en adeli n wak abu bakar Issues:
PIAS LOG ENTRY: 11JAN24
WS,FZ,SF 10.00am Testing 1 module lantai.
10.30 pagi, WS, SF n FZ.
10.30am, WS, SF n FZ.
WS, FZ & SF pergi ke tapak bengkel bukit Pelanduk untuk melihat projek tersebut. En Ramli, EN Kamaruzzaman dan Wak (tukang kayu) berada di tapak untuk menerima kami. Rupa-rupanya struktur utama sudah siap kecuali kasau. Papan lantai belum diletakkan. Ukuran balkoni (anjung) melebihi 1 kaki kerana tukang kayu merujuk kepada dimensi keseluruhan 13' dalam lukisan. WS menerangkan penggunaan grid tartan kepada tukang kayu dan dia akan memotong 1' di sekitar Serambis. Lawatan seterusnya ialah 8 Januari. Harapkan pasukan terlibat dalam pembongkaran dan pemasangan unit. Isu lain ialah tiang luar tidak mempunyai rasuk dan ini membimbangkan tukang kayu. Beliau mencadangkan untuk memperkenalkan kayu silang untuk menstabilkannya. Tetapi kami fikir tidak perlu berbuat demikian kerana kasau akan melakukan tugas itu nanti. Mereka akan memotong lajur luar ke ketinggian yang betul sebaik sahaja kasau dipasang.
WS, FZ & SF went to site in workshop bukit Pelanduk to see the project. En Ramli, EN Kamaruzzaman and Wak (carpenter) was on site to receive us. Apparently main structure is all up except for rafters. Floor board not yet placed. The balcony's (anjung) measurement exceeded 1 foot due to the carpenters refereing to 13' overall dimension in drawings. WS explained the use of tartan grid to the carpenter and he will cut off 1' around the Serambis. Next visit is 8th of January. Expect the team to get involved in the dismantling and installation of the units. Another issue is the outer column has no beam and this worry the carpenter. He suggested to introduce cross timber to stabilise it. But we think theres no need to do so since the rafters will do the job later on. They will cut the outer column to proper height once the rafters in place. |
PEngenalanBlog ini merupakan repository entri log untuk projek PIAS yang dibina di Kampung Bukit Pelanduk, Port Dickson. ArkibKategori |